News
WTP at the Opole Power Plant –another elevation is liven up
28.03.2017
Another WTP building in the Opole Power Plant has completed the elevation. This time the Filter and DEMI Water Building joined to the “blue objects”. Inside the building, the assembly of pipelines, fittings and support structures under the pipelines, as well as industrial water installations, rain water drainage, ventilation systems, and central heating installations are in progress.
There are also electrical switchgears that Elemont has supplied and assembled in the building. In addition to the switchboards, the fire alarm signaling system, lighting and support structures are also provided.